All instructions for preparation, ground preparation and paving.

Processing

Sub-soil:The sub-soil should be firm and free of loose material. The surface should be free of rough contamination or dust, and free of standing water and ice. The repair site should be dry, or can be slightly moist.

Installation:
Shake AIRphalt directly from the bucket into the repair site, or scatter it with a shovel or trowel from the bucket into the damaged site. Pack the AIRphalt® to conform to the repaired area, and slightly heaped (5 – 10%). Compact the AIRphalt with a suitable tool (stamper, vibrating plate compacter, roller …).